WHAT WE DO

Infrastructure Division

Railway Department

Design Competition for Combined Transit Center in Gangnam Area

Design Competition for Combined Transit Center in Gangnam Area

Traffic Safety Diagnosis of Dobongsan Mountain ~ Okjeong District 13 Railway Construction Project

Post-Evaluation of Wangsimni ~ Seonneung

Construction Management Service for the New Facility System of the Sillim Line Light Rail Construction

"High-speed, Safety, and Comfort Rail System Establishment"

In recognition of its unlimited potential and service performance, Railway Department of KDEC is committed to deploying excellent experts from the initial planning stage to design, construction, operation and maintenance, including high-speed rail, general railway, subway, and new transport mode (Monorail, Tram) and to take pride in building the national railway network. We also carry out post-assessment, railway traffic safety diagnosis, preliminary feasibility study, and preliminary feasibility study. Through excellent technical staff and the best design know-how, our team is establishing a comprehensive railway system in the 21st century, and is striving to actively advance into overseas railway markets while doing its best to develop the nation.

Business Fields

· High-speed railway / General railway / Wide-area railway
- Preliminary Feasibility Study and Feasibility Study
- Basic plan
- Basic and Detailed Engineering Design
- Turnkey and Alternative Design
- BLT / BTO Design
- Design and Construction Supervision
· Urban / light rail / maglev levitation train
- Preliminary Feasibility Study and Feasibility Study
- Basic plan
- Basic and Detailed Engineering Design
- Turnkey and Alternative Design
- BLT / BTO Design
- Design and Construction Supervision
· Overseas Railway Projects
· Track design and monitoring
· Facility design and supervision
- Yard, Railway, Rail Depot, etc.
- Vehicle system
- Gauge electrical wiring
- Inspection Facility
- Multi-level Intersection

Major Project